پروژه واردات خط تولید لوله و کانال فلزی

Import of Metal Pipe and Duct Production Line

  • Project Name: Import of Metal Pipe and Duct Production Line
  • Origin: Guangzhou, China
  • Destination: Shahid Rajaee Customs, Bandar Abbas
  • Gross Weight: 7,290 kg
  • Net Weight: 6,706 kg
  • Purchase Term: CFR
  • Executing Company: Dideban Tejarat
  • Task Description: Import and customs clearance
  • Project Duration: 48 days

 

Description of the Metal Pipe and Duct Production Line Import Project

In early autumn of 2023, a large manufacturing company in Tehran decided to start a project to import a metal pipe and duct production line from China to expand and modernize its production facilities. The company sought a product with up-to-date technology and high quality, capable of competing in both domestic and international markets. After evaluating various options, the decision was made to import the production line from Guangzhou. To carry out this significant project, the company reached out to Dideban Tejarat, an international holding company.

The purchase term was CFR, meaning the Chinese supplier handled the delivery of the shipment to Shahid Rajaee Port in Bandar Abbas. Once the shipment arrived in Iran, Dideban Tejarat took over the responsibility of customs clearance and delivery.

 

Specifications of the Metal Pipe and Duct Production Line Shipment

The metal pipe and duct production line, with a substantial weight (7,290 kg gross and 6,706 kg net), was one of the most critical projects for the client company at that time. Any delay or issue in the clearance process could have significantly impacted their production schedule.

 

Project Execution

After initial coordination with the supplier in Guangzhou, the shipment was carefully loaded. The logistics team at Dideban Tejarat monitored and followed up continuously from the moment of loading to ensure the shipment would arrive at Shahid Rajaee Port on time and without any issues.

After completing its sea journey, the vessel carrying the production line, arrived at Shahid Rajaee Port. Dideban Tejarat customs clearance team was prepared to act swiftly. This stage required high precision and expertise, as any issues with documentation or delays in the customs process could delay the entire project. Leveraging their extensive experience in clearing industrial and heavy goods, the Dideban Tejarat team completed all clearance procedures and obtained the necessary permits with accuracy and speed.

Given that the final destination of the shipment was Tehran, under the supervision of the Dideban Tejarat team, the equipment was loaded for domestic transport to Tehran. Ultimately, after 48 days, the production line was successfully delivered to the client in Tehran.

This project stands as a testament to Dideban Tejarat’s capability to handle imports under CFR terms and perform customs clearance with sufficient precision and speed for its clients.

5 1 vote
امتیازدهی به مقاله
Subscribe
Notify of
0 نظرات
Oldest
Newest Most Voted
Inline Feedbacks
View all comments

Website Search

Customs Tariff Search

Consultation Request Form